Topic | Deconstruction and Adaptive Reuse

Deconstruction and Adaptive Reuse: DE-construct to RE-construct

Keywords: Deconstruction, recycle, demolition, waste, sustainable, environment, materials reuse, building reuse, structure reuse, redevelopment, disassembly, adapted reuse.

image-1

Abstract: Our lands are filled with abandoned buildings and old structures. Many of these places stay vacant and unused or face demolition and end up in land fills. What happens when the demolition takes place? One, the construction industry in this process generates huge amounts of waste (25—45% of the national waste stream. EPA, 1998) and two, the materials that could have been reused or recycled for the new construction are lost. A way to approach this issue could be in the form of a ideological  technical and designed “deconstruction”. This paper will try to clarify the real meaning of the word DE-construction, defines the meaning of deconstruction and how can it be applied and creates a link with the RE-construction of Adaptive Reuse projects.

Case studies:

  • Big dig house (Boston)
  • Shipping Containers Playground (San Francisco)
  • Jean Prouvè House (France)
  • Ocean scope (Sunset Observatory) South Korea

 

by Maria Martins

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s